+086 027 68772275
The Lab was established in 1950s and then expanded in 1998. The total construction area is about 2000m2, with fixed assets worth over 4 million RMB.The main equipment consists of seven systems: open water-circulating system, model machine units system, control system, simulating electrical load system, measuring system, monitoring control system, and water-course system. All the seven systems make up a whole physical simulation for a hydropower station under various operating conditions.
|