The base was established in 2012, at Tuditang Community, Jiangxia District, Wuhan. The total construction area is about 3600m2, 120m long, 30m wide and 15~18m high, with fixed assets worth over 8 million RMB.The main equipment consists of nine systems: open water-circulating system, model waterway system,model machine units system, excitation-synchronization- protection system, speed control system, frequency conversion and phase switch system, monitoring control system,simulation electrical load system, and measuring system.The system can simulate the all kinds of operating conditions in pumped-storage hydropower station. |